{"id":603,"date":"2026-07-14T16:37:25","date_gmt":"2026-07-14T16:37:25","guid":{"rendered":"https:\/\/dirco.gov.za\/venezuela\/?p=603"},"modified":"2026-07-16T16:44:36","modified_gmt":"2026-07-16T16:44:36","slug":"summary-of-the-technical-report-provided-by-the-elevator-company-en-ascenso-2011","status":"publish","type":"post","link":"https:\/\/dirco.gov.za\/venezuela\/2026\/07\/14\/summary-of-the-technical-report-provided-by-the-elevator-company-en-ascenso-2011\/","title":{"rendered":"Summary of the technical report provided by the elevator company, En Ascenso 2011"},"content":{"rendered":"<p><strong>Overview<\/strong><\/p>\n<p>To: Condominio Edificio Atrium.<\/p>\n<p>From: Yanervis Fari\u00f1a, Operations Manager at En Ascenso 2011 C.A.<\/p>\n<p>Date: July 6, 2026 (Valencia, Venezuela).<\/p>\n<p>Purpose: To report on the technical status of the building&#8217;s vertical transport systems following an earthquake recorded on June 24, 2026. The inspection aimed to verify structural, mechanical, and electrical integrity in accordance with Venezuelan COVENIN 621 safety regulations.<\/p>\n<p><strong>Inspection Scope<\/strong><\/p>\n<p>The technical team performed an exhaustive review of critical components across both the right and left elevator systems, including:\u00a0 Guide rails and fixings (alignment, verticality, and structural supports).\u00a0 Counterweight systems (sliding elements and guiding).\u00a0 Traction and traveling cables (tension and checking for seismic-induced tangles). Elevator pit and machine room (motors, brakes, electrical panels, and general cleanliness). Inspection<\/p>\n<p><strong>Results<\/strong><\/p>\n<p>Elevator No. 4596: The counterweight was found off its rail. Technicians repositioned, verified, and adjusted it. It has been left turned off under normal conditions.<\/p>\n<p>Elevator No. 4594: The system was found with its safety features activated. It was verified and has also been left turned off under normal conditions.<\/p>\n<p>Elevators No. 4593 \/ 4595 \/ 4597: These units suffered no structural or mechanical damage. Following successful safety testing, they have been left fully operational.<\/p>\n<p><strong>Recommendations (Preventive Alert Period)<\/strong><\/p>\n<p>Due to the ongoing potential for seismic aftershocks, the company advises the following:<\/p>\n<p><strong>Immediate<\/strong> <strong>Shutdown<\/strong>: If any unusual vibration, strange noise, or malfunction is detected in the active elevators, they must be turned off immediately, service suspended, and emergency technical assistance notified.<\/p>\n<p><strong>Conscious<\/strong> Use: Residents are encouraged to use the stairs when possible, leaving the operational elevators available for emergencies or individuals with reduced mobility.<\/p>\n<p><strong>Vigilance<\/strong>: Stay alert to any unusual behavior from the elevator systems.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Overview To: Condominio Edificio Atrium. From: Yanervis Fari\u00f1a, Operations Manager at En Ascenso 2011 C.A. Date: July 6, 2026 (Valencia, Venezuela). Purpose: To report on the technical status of the building&#8217;s vertical transport systems following an earthquake recorded on June 24, 2026. The inspection aimed to verify structural, mechanical, and electrical integrity in accordance with [&hellip;]<\/p>\n","protected":false},"author":21,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","postBodyCss":"","postBodyMargin":[],"postBodyPadding":[],"postBodyBackground":{"backgroundType":"classic","gradient":""},"footnotes":""},"categories":[8],"tags":[],"class_list":["post-603","post","type-post","status-publish","format-standard","hentry","category-notices"],"rttpg_featured_image_url":null,"rttpg_author":{"display_name":"Brian","author_link":"https:\/\/dirco.gov.za\/venezuela\/author\/jollyapples\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/dirco.gov.za\/venezuela\/category\/notices\/\" rel=\"category tag\">Notices<\/a>","rttpg_excerpt":"Overview To: Condominio Edificio Atrium. From: Yanervis Fari\u00f1a, Operations Manager at En Ascenso 2011 C.A. Date: July 6, 2026 (Valencia, Venezuela). Purpose: To report on the technical status of the building&#8217;s vertical transport systems following an earthquake recorded on June 24, 2026. The inspection aimed to verify structural, mechanical, and electrical integrity in accordance with&hellip;","_links":{"self":[{"href":"https:\/\/dirco.gov.za\/venezuela\/wp-json\/wp\/v2\/posts\/603","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dirco.gov.za\/venezuela\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dirco.gov.za\/venezuela\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dirco.gov.za\/venezuela\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/dirco.gov.za\/venezuela\/wp-json\/wp\/v2\/comments?post=603"}],"version-history":[{"count":1,"href":"https:\/\/dirco.gov.za\/venezuela\/wp-json\/wp\/v2\/posts\/603\/revisions"}],"predecessor-version":[{"id":604,"href":"https:\/\/dirco.gov.za\/venezuela\/wp-json\/wp\/v2\/posts\/603\/revisions\/604"}],"wp:attachment":[{"href":"https:\/\/dirco.gov.za\/venezuela\/wp-json\/wp\/v2\/media?parent=603"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dirco.gov.za\/venezuela\/wp-json\/wp\/v2\/categories?post=603"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dirco.gov.za\/venezuela\/wp-json\/wp\/v2\/tags?post=603"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}